RUIDP Waste Water Treatment Plant 50 KLD
The Patents Act 1970-Patent File Application
Process Document
Flow Diagram Treatment Process Of RUIDP-WWTP.
Standard Drawing Of General Arrangement Of Waste-Water Treatment Plant 50 KLD RUIDP Technology Ground-View.
Structure Drawing Of (WWTP) Waste-Water Treatment Plant 50 KLD RUIDP Technology.
Standard Drawing Of Structure Drawings Tranch - I
1. Clear Water Reservoir
2. Sewage Treatment Plant (STP)
4. Water Treatment Plant (WTP)
Circular & Guideline RUIDP Phase-III
Circulars & Guideline
Office order & Others
BSR of RUIDP
Standard Documents
Circular & Guideline RUIDP Phase-III
Hand Book
Circular & Guideline RUIDP Phase-IV
Standard Quality Assurance Plan
Gallery
Photo-Phase-I
Ph-I
Photo Gallery
Video Gallery
Phase-I
Phase-II
Phase-III
Other Activities
Community Awareness & Participation Program (CAPP)
Investment Program Performance Monitoring System (IPPMS)
Community awareness & participation consultancy (CAPC) Services
Project Cities
Project Monitoring
Public Grievances
Quotations & Tender
Right to Information
RUIDP Directory
RUIDP GIS
PHASE-III
Pali-GIS
RUIDP MIS
Safeguard Policies/Appr. Documents
Social Monitoring Report PH-IV
Social Monitoring Report PH-III
Phase - IV Additional Financing
Safeguard Policy Statement
Initial Environmental Examination (IEE)Reports
For Details
Initial Environmental Examination (IEEs) Reports
Semi-Annual Environmental Monitoring Report (SEMR)
RUIDP-PHASE-IV
RUIDP-PHASE-III
RUIDP-PHASE-II
Executive Summary In HIndi
Short Resettlement Plan (SRP-PH-II)Reports
Short Resettlement Plan (SRP-PH-III)Reports
Social Monitoring Report PH-III
Resettlement Plan (RP-PH-IV)Reports
Social Monitoring Report PH-IV
Additional Financing Phase - IV (RSTDSP)
Site Map
Success Stories
Targets Achievements & Hindi Note
Targets Achievements Phase - I
Targets Achievements Phase - II
Targets Achievements Phase - III
Targets Achievements Phase - IV (WS+WW)
Target Achievement Phase-IV (Draiange)
Hindi Note
Work Progress
Tender And Quotations
Tender And Quotations
RUIDP
Government of Rajasthan
Back to Main Portal
Skip To Main Content
A+
A
A-
Default
Light
Dark
Main Wrapper
4. Water Treatment Plant (WTP)
WATER TREATMENT PLANT ABU ROAD
1.
Standard Drawing Of GA Drawing Of Cascade Aerator Parshall Flume Flash Mixer And Distribution Chamber 10 MLD WTP At Abu Road.
2.
Standard Drawing Of Sludge SUMP Dewatering Room, Chemical House, Chlorinator Room And Tonner Room, Filter House & Annex Building And Dirty Backwash Tank At 10 MLD WTP Abu Road (Architectural Details).
3.
Standard Drawing Of Sludge Storage Yard At 10.0 MLD WTP (NUM And RC Details).
4.
Standard Drawing Of Sludge SUMP Dewatering Room, Chemical House, Chlorinator Room And Tonner Room, Filter House & Annex Building And Dirty Backwash Tank At 10 MLD WTP Abu Road (Numeration Details).
5.
Standard Drawing Of Clariflocculator For 10 MLD WTP At Abu Road Numeration Details.
6.
Standard Drawing Of Cascade Aerator Parshall Flume Flash Mixer And Distribution Chamber 10 MLD WTP At Abu Road (Numeration Details).
7.
Standard Drawing Of GA Drawing Of Sludge Storage Yard For 10.0 MLD WTP At Abu Road.
8.
Standard Drawing Of GA Drawing Of Sludge Handling Units – Sludge SUMP And Dewatering Room For 10.0 MLD WTP Abu Road.
9.
Standard Drawing Of General Arrangement Drawing Of Dirty Backwash Settling Tank For 10 MLD WTP At Abu Road.
10.
Standard Drawing Of GA Drawing Of Filter House & Filter Annexe Building For 10 MLD WTP At Abu Road.
11.
Standard Drawing Of GA Drawing Of Chemical House For 10 MLD At Abu Road.
12.
Standard Drawing Of Layout Plan Of 10 MLD WTP At Abu Road.
13.
Standard Drawing Of General Arrangement Drawing Of Chlorinator Room And Chlorine Tonner Room For 10 MLD WTP At Abu Road.
14.
Standard Drawing Of General Arrangement Clariflocculator For 10 MLD WTP At Abu Road.
WATER TREATMENT PLANT BANSWARA
1.
Standard Drawing Of General Arrangement For CRMC Building At Banswara.
2.
Standard Drawing Of Mechanical General Arrangement Drawing For Clariflocculator (Banswara WTP 9.25 MLD) At Banswara.
3.
Standard Drawing Of STR Details Drawing For Clarifier Sludge SUMP Of (Banswara WTP 9.25 MLD) At Banswara.
4.
Standard Drawing Of Structural Drawing For CW PH Foundation And Column Details At Banswara.
5.
Standard Drawing Of Key Plan For Water Treatment Plant At AEN Campus At Banswara.
6.
Standard Drawing Of General Arrangement Drawing For Bypass Channel And Connection Channel At Banswara.
7.
Standard Drawing Of General Arrangement Drawing For Clarifier Sludge SUMP (Banswara WTP 9.25 MLD) At Banswara.
8.
Standard Drawing Of Structural Drawing For Inlet Chamber And Flash Mixer (Banswara WTP 9.25 MLD) At Banswara.
9.
Standard Drawing Of General Arrangement Drawing For Chlorine Contact Tank ( Banswara WTP 9.25 MLD)
10.
Standard Drawing Of Structural Drawing For Chlorine Contact Tank ( Banswara WTP 9.25 MLD)
11.
Standard Drawing Of Structural Drawing For Clariflocculator (Banswara WTP 9.25 MLD)
12.
Standard Drawing Of General Arrangement Drawing For Filter House And Annex Building (Banswara WTP 9.25 MLD)
13.
Standard Drawing Of General Arrangement Drawing For Clear Water Reservoir - 1550 KL.
14.
Standard Drawing Of Structural Drawing For Filter House And Annex Building (Banswara WTP 9.25 MLD).
15.
Standard Drawing Of General Arrangement Drawing For Inlet Chamber And Flash Mixer.
16.
Standard Drawing Of STR Details For Wash Water Collection SUMP Of (Banswara WTP 9.25 MLD).
17.
Standard Drawing Of Structural Drawing For Chemical House (Banswara WTP 9.25 MLD).
18.
Standard Drawing Of Reinforcement Details Of CCC Building For WTP At AEN Campus Banswara.
19.
Standard Drawing Of General Arrangement Drawing For Clariflocculator (Banswara WTP 9.25 MLD).
20.
Standard Drawing Of General Arrangement Drawing For Chemical House (Banswara WTP 9.25 MLD).
WATER TREATMENT PLANT SIROHI
1.
Standard Drawing Of Clariflocculator For 9 MLD WTP At Sirohi- Numeration Details.
2.
Standard Drawing Of General Arrangement Clariflocculator For 9 MLD WTP At Sirohi.
3.
Standard Drawing Of Process Flow Diagram For 9 MLD WTP At Sirohi.
4.
Standard Drawing Of Cascade Aerator, Parshall Flume, Flash Mixer, And Distribution Chamber 9 MLD WTP At Sirohi (RC Details).
5.
Standard Drawing Of Cascade Aerator, Parshall Flume, Flash Mixer, And Distribution Chamber 9 MLD WTP At Sirohi (Numeration Details).
6.
Standard Drawing Of Admin, Workshop & MCC 9 MLD WTP At Sirohi (Numeration Details).
7.
Standard Drawing Of Sludge SUMP, Dewatering Room, Chemical House, Chlorinator Room, And Tonner Room, Filter House & Annex Building And Dirty Backwash Tank At 9 MLD WTP Sirohi (Numeration Details).
8.
Standard Drawing Of Layout Plan Of 9 MLD WTP At Sirohi.
9.
Standard Drawing Of Hydraulic Flow Diagram For 9 MLD WTP At Sirohi.
10.
Standard Drawing Of GA Drawing Of Cascade Aerator, Parshall Flume, Flash Mixer And Distribution Chamber 9 MLD WTP At Sirohi.
11.
Standard Drawing Of GA Drawing Of Chemical House For 9 MLD WTP At Sirohi.
12.
Standard Drawing Of General Arrangement Drawing Of Chlorinator Room And Chorine Tonner Room For 9 MLD WTP At Sirohi.
13.
Standard Drawing Of General Arrangement Drawing Of Dirty Backwash Settling Tank For 9 MLD WTP At Sirohi.
14.
Standard Drawing Of GA Drawing Of Sludge Handling Units – Sludge SUMP And Dewatering Room For 9.0 MLD WTP At Sirohi.
15.
Standard Drawing Of Workshop, MCC Room, Admin Building, DG & Transformer Foundation For 9 MLD WTP At Sirohi (Architectural Details).
16.
Standard Drawing Of GA Drawing Of Filter House & Filter Annexe Building For 9 MLD WTP At Sirohi.